How weatherproofing differs in refurbishment and new-build projects

Share page here

Whether a project is a new-build development or a refurbishment, weatherproofing building penetrations is an important part of protecting the building envelope. However, the challenges for each type of project can be very different.

In new builds, there is typically an opportunity to plan out the weatherproofing and penetrations, providing greater control over design, materials, sequencing and access. Refurbishments, on the other hand, are often prompted by an existing problem, such as water ingress, or the need to upgrade or replace existing services. Weatherproofing teams must work with what is already there – including existing roofs and facades, rooftop plant and live services – while information about the build-up may be incomplete or inaccurate.

For architects, specifiers, contractors and building owners, understanding these differences can help identify potential risks and ensure that building penetrations are weatherproofed efficiently and effectively.

Building information and existing conditions for effective weatherproofing

One of the biggest differences between new-build and refurbishment projects is how much building information is available and how accurate it is.
On a new build, the weatherproofing team can easily establish the roof or wall build-up, including structural elements, interface construction and the materials used.

Jamie Sporcic, Senior Sales Manager at Jones Weatherproofing, says that they can also determine the position of services passing through vertical penetrations before construction begins. “However, design flexibility can be an important consideration, as penetration layouts and service requirements often change during construction. A weatherproofing system that can be easily adapted for last-minute changes can help to avoid delays and provide versatility on a busy construction site,” he adds.

Refurbishment projects are rarely so straightforward. Depending on the age of the building, information may be incomplete or difficult to come by. Any information that can be collected may be out of date, as previous repairs, alterations or additions may have changed the roof or facade. In addition, services may have been installed or repositioned since the original construction.

“For building owners and project teams, having a clear understanding of a building’s construction and existing condition can help to avoid unexpected problems once work begins,” Jamie explains. “Specialist weatherproofing contractors can review the available information and carry out site surveys to learn more about the building, its penetrations and weatherproofing requirements,” he says.
In addition, the choice of weatherproofing method can play an important role in sealing a building where incorrect or incomplete information is available. For example, the liquid-applied weatherproofing material used by Jones Weatherproofing is solvent-free and can be used on any type of roofing material, including GRP.

Considering the roof or facade’s condition when weatherproofing penetrations

In new-build projects, the condition of the roof or facade should typically be less of a concern, since you should be starting with a clean slate. However, if a penetration has been left exposed during wet or windy weather, its condition may have deteriorated and must be repaired before weatherproofing can be carried out.

“When weatherproofing roof penetrations in refurbishment projects, the condition of the roof or facade can be much less predictable,” Jamie warns. “Existing substrates may have deteriorated, previous repairs may have been carried out, and there may be areas that consist of several different materials, each with different properties and conditions.”

The condition of the existing roof or facade may also affect how work is carried out. If materials are deteriorated, surfaces are unstable, or areas have been affected by previous damage, the weatherproofing team may need to take additional precautions to ensure safe access.
Jamie suggests that a site survey can help to identify these issues early: “Site surveys can provide valuable insight into the building and its penetrations. This enables the project team to plan any necessary repairs and consider access requirements early, helping to reduce risk and uncertainty.”

 

Gloucester energy from waste wide project shot

 

Building penetrations weatherproofing around live services

Refurbishment projects often take place while a building remains operational. This means that existing services – such as electricity, data, water, wastewater and ductwork – are live and need to remain operational wherever possible to avoid downtime. In some locations, access may also be restricted to particular times to avoid construction noise or other disruption to building occupants.

Where pipes, cables, ductwork or other services need to be added or removed, the positioning of existing services can restrict access to the building penetration. Pipe lagging may also make it more difficult to access the area or achieve the required weatherproofing detail. In contrast, factory-made details such as weatherproofing cabinets may not accommodate changes to existing services.

In these situations, Jamie explains that an adaptable weatherproofing system can provide greater flexibility, allowing the weatherproofing to be installed around the existing construction and services, rather than requiring the surrounding installation to be altered to accommodate it. “Liquid-applied weatherproofing is also quick to apply and requires no noisy or heavy equipment, further helping to avoid disruption,” he says.

Flexibility when weatherproofing new-build penetrations

On new-build projects, the building envelope and services are being designed together. This allows architects, engineers, contractors and weatherproofing specialists to plan and coordinate the building penetrations before installation begins. Penetrations can be positioned with the construction sequencing in mind, and access can be considered alongside the rest of the roof, cladding and other trades.

While new-build projects provide design flexibility, they also require practical flexibility. With so many parts coming together on site, service requirements and layouts often change during construction.

“Early engagement with the weatherproofing specialist can help prevent these changes from becoming problems later,” Jamie explains. “Building penetrations weatherproofing should be considered part of the interface between the services and the building envelope, rather than as a finishing detail at the end of the project,” he adds.

Why sequencing matters on every weatherproofing project

Whether a project is a refurbishment or a new build, the timing of weatherproofing installation is an important consideration.

On a new build, penetration weatherproofing can usually be planned as part of the overall construction sequence. With good communication and early engagement, the building envelope, services and weatherproofing can all be coordinated so that each trade has the access it needs and penetrations are sealed at the appropriate stage.

While refurbishment programmes can be more unpredictable, site surveys and careful planning can help ensure weatherproofing is carried out at the right time, giving installers appropriate access, reducing the risk of weather damage, and helping ensure completed weatherproofing is not compromised by subsequent works.

Managing unexpected site conditions and building penetrations weatherproofing

In any project, there’s always the risk of the unexpected. No amount of design information or planning can eliminate uncertainty. This is why installation flexibility and specialist experience can be especially valuable.

Jamie explains how the versatility of the Jones Weatherproofing system helps to overcome any unexpected site conditions: “At Jones Weatherproofing, we use a cold-applied liquid weatherproofing that can be formed in situ around complex building penetrations. It can accommodate any service configuration, as well as last-minute alterations,” Jamie explains.

“Our weatherproofing system can be applied to any substrate, including GRP flat roofs. This makes it suitable for both new-build projects and refurbishments. It also means that unexpected variations in materials won’t stand in the way of effective weatherproofing.”

Building penetrations weatherproofing, surveys and specialist input from Jones Weatherproofing

Both new-build and refurbishment projects come with their own unique challenges, but whether the challenge is incomplete information, difficult access or last-minute design changes, the Jones Weatherproofing team has the experience and flexibility to adapt.
Site surveys and early specialist input can help identify potential issues before work begins, while the versatility of our cold-applied liquid weatherproofing means that our system can be adapted to suit a wide range of building penetrations, substrates and service configurations.

If you’re planning a refurbishment or a new-build project, speak to Jones Weatherproofing early to identify risks, coordinate key interfaces and develop a project-specific weatherproofing solution.

Building penetration weatherproofing: Coordinating M&E and building envelope design

Share page here

Mechanical and electrical (M&E) services are essential to modern buildings, but they need to pass through the building envelope. Building penetrations for service risers, ducts, pipes, cable trays and other services must be carefully planned throughout a project.

Early coordination between the M&E teams and the teams responsible for the building envelope – including architects, facade and roofing designers, main contractors and specialist contractors – can help to ensure that the building penetrations are properly designed, weatherproofed and installed. This helps preserve the building’s weather resistance, thermal performance and long-term integrity, while also preventing late design changes, restricted access, programme delays and remedial work.

Penetration weatherproofing: Why M&E and building envelope coordination matters

The building envelope and M&E services are often designed separately. However, they must work together wherever services pass through the building envelope to ensure the resulting penetrations are safe, secure and weatherproof.

Ducts, pipes, cable trays and other services must pass through roofs, facades or external walls to connect with systems inside the building. Each penetration creates an interface with the building envelope that needs to be considered as part of the overall design. This creates shared responsibilities:

  • The M&E team understands the service requirements, including size and position, as well as movement and access requirements.
  • The architect and facade/roofing designer understand the building envelope requirements, including thermal performance, weather resistance and structural requirements.
  • Contractors need to install the various elements within the constraints of the construction programme.

If these requirements are not coordinated, conflicts can arise over positioning, access, structural support, weatherproofing and overall responsibility for the penetration. Alec Beards, Technical Sales Engineer at Jones Weatherproofing, explains that involving a building penetration specialist can help resolve these conflicts: “A designated penetration weatherproofing team can coordinate the interfaces between different trades and ensure that the penetration is properly planned, installed and weatherproofed at the appropriate time in the construction sequence.”

Where coordination gaps commonly occur in relation to weatherproofing penetrations

Within a construction project, there are many different teams working together to complete the project. However, while they may all be working towards the same end goal, they are also working individually to complete their specific tasks. This separation between disciplines can leave interfaces such as vertical penetrations vulnerable to coordination gaps.

At the planning stage, for example, M&E consultants may establish the service routes without knowing the precise requirements of the roofing or facade system. Conversely, the building envelope design may be developed before the M&E requirements are confirmed.

Changes can also occur as the project progresses. Service sizes or routes may change, equipment may be positioned differently, and additional penetrations may be required. If the implications for the building envelope are not considered at the same time, a previously agreed penetration detail may no longer be suitable.

To avoid these coordination gaps, clear communication between the various parties is essential. “The weatherproofing contractor should also be involved from the earliest stages to provide another layer of technical input before details become difficult or expensive to change,” Alec adds.

 

 

How service penetration weatherproofing affects building performance

Service penetrations may be a relatively small part of the building envelope, but if they are not properly weatherproofed, they can affect several aspects of the building’s performance.

  • Water ingress – The most obvious consideration is keeping water out of the building. Leaks through improperly sealed building penetrations can damage internal fittings, equipment and finishes. They can also cause discomfort and disruption for occupants. Moisture build-up can also cause problems such as mould and mildew, and damage to the various layers of the building envelope, including structural supports and insulation.
  • Airtightness – Gaps or poorly detailed interfaces around building penetrations can compromise thermal performance and cause draughts.
  • Thermal continuity – Where services pass through insulated roof or wall build-ups, the design needs to account for the surrounding insulation. Poorly coordinated penetrations can create discontinuities that cause thermal bridging or thermal bypass, causing heat loss and reducing the building’s overall thermal performance.
  • Fire performance – Roofs and walls have specific fire performance requirements, and the penetration should be appropriately detailed to maintain the performance of the surrounding construction.
  • Aesthetics – Building penetrations can affect the appearance of a facade or roof. They should be positioned in a way that doesn’t detract from the architectural design. Materials can also be colour-matched to help the penetrations blend in with the rest of the building.
  • Long-term durability – The penetration needs to remain effective throughout the life of the building. Considering the durability of the detailing materials, as well as any maintenance requirements, at the design stage can help to identify potential issues, prevent deterioration and avoid future problems.

Why building penetration weatherproofing should be considered early

Considering building penetrations early in a project creates better opportunities to identify and resolve potential conflicts before they become problems.

At the design stage, service routes can be coordinated with structural elements, roofing and facade build-ups. The location and size of penetrations can be agreed before construction begins, and sequencing can include opportunities for weatherproofing when access is more convenient.

Once construction begins, these planning decisions can be more difficult to integrate, and inadequate planning can lead to access difficulties, space constraints or delays. Conflicting service routes, restricted working space and changes to the surrounding construction can all make penetration weatherproofing more difficult once work is underway.

These issues can result in remedial work, additional site visits and programme delays. Alec notes that early specialist input can help identify these risks before they become problems. “The Jones Weatherproofing team can review proposed penetrations, consider the surrounding construction and advise on how the interface can be detailed and installed,” he says.

He adds that weatherproofing specialists can also help to establish sequencing and access: “Incorporating weatherproofing into the programme, rather than treating it as an unplanned late-stage activity, can help avoid access and sequencing issues later on.”

Clarifying responsibility for the complete building penetration interface

One of the most important aspects of coordinating building penetrations is establishing who is responsible for the complete interface. The M&E contractor may be responsible for the service, while the roofing or cladding contractor is responsible for the surrounding envelope. Without clear responsibility, important elements of the penetration detail can be overlooked.

Responsibility should therefore be established before installation begins. Alec concludes: “A building penetration specialist can oversee the complete penetration and ensure the service, surrounding construction and weatherproofing all work together.”

Jones Weatherproofing specialises in building penetrations, providing site surveys, expert guidance and weatherproofing services. Our cold-applied liquid weatherproofing can be applied in situ around complex service configurations. It is suitable for use with any substrate, offering flexibility where multiple services pass through a single penetration, and it can be easily adapted if site conditions change from the original design.

Early engagement is always recommended, as it enables us to identify potential access and detailing issues before they become problematic. However, our team can also join a project at a later stage, taking a proactive approach to resolving any issues that arise during installation.
If you’re planning service penetrations through a roof or facade, speak to Jones Weatherproofing today to help coordinate the building envelope interface and reduce project risk.