The globally trusted partner for weatherproofing solutions in construction

Best practice for weatherproofing on data centres - CPD

Share page here

Data centres are mission-critical environments where weatherproofing failures can have serious consequences, from water ingress and damage to sensitive equipment to operational disruption and unplanned shutdowns. With large numbers of penetrations required for cable trays, pipework, ductwork, electrical services and rooftop plant, effective coordination between the structure, building services and envelope is essential to long-term performance.

This CPD explores best practice for weatherproofing data centres, with a particular focus on the importance of early engagement and the careful detailing of building penetrations. It examines why these interfaces can become common points of failure and the risks associated with leaving weatherproofing decisions until later in the construction programme.

Attendees will learn how late engagement can create restricted access, clashes between trades, additional remedial work, programme delays and unplanned costs. It can also compromise weather resistance, structural durability and the overall performance of the building envelope.

The CPD also compares traditional weatherproofing approaches with modern cold-applied liquid systems, considering how adaptable, joint-free solutions can accommodate complex penetration shapes, unusual service configurations and last-minute changes on site.

What will you learn?

  • Why early engagement is important
  • The risks associated with late weatherproofing decisions
  • How weatherproofing can support design intent
  • The main weatherproofing methods available
  • How complex data centre penetrations can be approached
  • The performance and durability requirements of liquid weatherproofing
  • How effective detailing can reduce long-term maintenance and performance risks

You can book a CPD by filling out the online booking form on the right.